Bag gucci 2009
Bag gucci 2009
Bag gucci 2009
Client: Jarl & Donna Nielsen
Chronology:
- Design – Spring 2010
- Construction – Summer / Fall 2010
Major Consultants:
- Interior Designer – Sage Interiors
- Structural Engineer – Forbes Engineering
General Contractor: Kulau Construction, Sparks, NV
Construction Value: $105,000
Project Description: Kitchen remodel of historic residence located in southwest Reno. The original portion of the residence was built in Virginia City in the 1890′s, moved to downtown Reno in the 1920′s, and then to its current site in the1940′s, where it was known as the Frost Ranch.



